Michigan Ashpalt Plant

From start to finish.

Pyramid Paving is your start to finish company. We specialize in drainage, subbase, base, and top.

Call us today for a quote on your next project that includes any of the following services.

Pyramid Paving's Services

Asphalt Recycling

Asphalt is 100% recyclable. Pyramid Paving can remove existing asphalt, either by cold-milling or excavation, and reintroduce it into a new mix at a later date. This is an environmentally friendly way to reconstruct your parking lot.

Cold milling is the process of removing asphalt with a machine consisting of a rotating drum with teeth and a conveyer belt and loading the removed asphalt into trucks. This process can be either done on the entire parking lot, or around hard surfaces such as curb, sidewalk, and catch basins.

Excavation is the process of removing sections of failing asphalt, usually to correct a sub base problem. The chunks of removed asphalt are loaded up and hauled back to our stock pile of recyclable asphalt which are later crushed & milled for re-use.

Latest News

November 19th, 2017

Be sure to check michigan.gov/mdot to check for construction & weather advisories!